November 27, 2025
Thinking about adding an accessory dwelling unit on your Cottage Grove property to create income, boost flexibility, or support multigenerational living? You are not alone. ADUs are gaining traction across Lane County, and with the right plan, they can strengthen your monthly cash flow and your home’s resale appeal. In this guide, you will learn what drives ADU costs, how permitting works locally, what returns to model, and the practical steps to move forward with confidence. Let’s dive in.
Oregon has a statewide framework that supports ADUs as a housing option. That said, the specific rules that apply to your property are set and administered locally. If you are inside Cottage Grove city limits, the City Planning Department governs your zoning and permits. If you are in unincorporated Lane County, Lane County Planning is your primary contact.
Before you spend on design or bids, confirm three things for your parcel: whether ADUs are allowed in your zoning, the maximum ADU size and height, and the setbacks and lot coverage rules. You should also verify parking, owner-occupancy rules, and how utility hookups must be handled. If you plan to rent nightly, check separate short-term rental regulations and any licensing and lodging tax requirements. A brief pre-application meeting with City or County Planning can save months of rework.
You will typically need zoning and land-use confirmation, a building permit, and trade permits for structural, mechanical, electrical, and plumbing. Plan on utility connection approvals for water, sewer or septic, and electrical service. Some sites may also require a site plan review or a conditional use review if there are unusual constraints. In many cases, a separate address assignment is issued for emergency services.
ADU budgets vary widely. The range depends on whether you are converting existing space or building a new detached unit, how simple or complex your site is, and the level of finishes. In western Oregon, moisture management and energy code compliance are important details that influence systems and materials.
Soft costs include architectural plans, engineering as needed, energy code documentation, permit and plan review fees, possible impact fees, and consultants. A practical planning rule is that soft costs often land at 10 to 20 percent of the construction contract. Complex sites can push that higher. Ask your designer and builder to break out soft costs so you can track and compare.
Hard costs cover the structure and the interior buildout: foundation, framing, roofing, windows and siding; plus plumbing, electrical, HVAC and ventilation; insulation and interior finishes. Kitchens and baths are cost centers because of fixtures, cabinets, and appliances. Conversions can be more budget-friendly if the shell and some utilities already exist, but upgrades for egress, insulation, and separate systems can offset those savings.
Site work can make or break your budget. Extending sewer or installing a compliant septic system can add substantial cost if the lot is not on city services. Water connections and separate meters add fees. Electrical service upgrades and new meter installations are common. Stormwater management, grading, trees, and driveway changes can add both time and money. In some scenarios, utility work can eclipse the building spend.
Oregon’s residential specialty codes and energy standards apply to ADUs. If you incorporate universal design or accessibility features, plan for added cost in doors, clearances, and fixtures. These investments can expand your potential tenant pool and improve long-term usability.
Set aside a 10 to 20 percent contingency for unknowns like soil conditions, old utility lines, or material delays. Local contractor availability in Lane County and current market conditions will also influence pricing and schedule.
You can get to a realistic estimate two ways:
Whichever path you choose, ask bidders to separate site utility work from building costs, and to highlight any assumed fees or allowances.
The core question most owners ask is whether an ADU will pay for itself. The answer depends on rent levels, total project cost, financing, taxes, and your operating approach.
Study current rents for units similar to your ADU plan by size and condition. Focus on studios, one-bedroom, or two-bedroom listings in Cottage Grove and nearby Lane County communities. Consider demand from commuters to Eugene and Springfield, local workforce renters, and smaller households. If you prefer not to manage tenants directly, request a rental opinion from a local property manager.
An ADU generally increases a property’s market value. Appraisers look at additional living area, rental income potential, and comparable sales. For sellers, an ADU can widen your buyer pool to include multigenerational households and investors. The premium is market-specific and is not usually a dollar-for-dollar match with construction cost. Local comps and an ADU-experienced appraiser can help you set expectations.
Create a basic spreadsheet to compare your expected income with your all-in costs.
Short-term rentals can generate higher gross income but come with higher operating costs, regulatory risk, and variable occupancy. Long-term rentals usually produce steadier cash flow and are less management-intensive. Local short-term rental rules in Cottage Grove or Lane County can directly determine if STRs are allowed, so verify before you plan on nightly rates.
Several local dynamics support ADU demand:
Neighborhood features like access to transit, services, and parks influence rent and tenant interest. If you plan to sell later, features that support everyday convenience can also help your listing stand out.
Owners typically fund ADUs through a mix of equity, loans, and specialized products. Common options include:
Compare interest rates, draw schedules, and closing costs, and align your financing with the likely construction timeline.
Expect your assessed value to increase after your ADU is completed, which can change your property tax bill. Rental income is taxable, but you can generally deduct operating expenses and depreciate the ADU structure. A local CPA can help you model after-tax returns and document deductions.
Inform your insurance agent about your project early. You may need builder’s risk during construction and higher dwelling and liability coverage once the unit is occupied.
Design and permitting can take weeks to months depending on review backlogs and complexity. Construction times vary from a few months for straightforward conversions to 6–9 months or more for detached builds. Utility upgrades and final inspections can add weeks, especially if multiple agencies are involved. Your contractor’s schedule and material lead times will also affect the calendar.
If you want flexible space for family, steady rental income, or an edge when you sell, an ADU can be a smart move in Cottage Grove. The key is to confirm your site’s rules, price the full project accurately, and stress-test your numbers before you build. If you are buying, a home with an existing or permitted ADU can streamline the path to income and broaden your options.
Curious how an ADU could affect your specific property value, rent potential, or timeline in Lane County? Let’s talk through your parcel, your goals, and a step-by-step plan. Reach out to Amanda Parker for a friendly, no-pressure consultation.
Stay up to date on the latest real estate trends.
Real Estate
Maximize Your Home's Appeal with Cutting-Edge Virtual Tours in Southwest Eugene
Real Estate
Maximize Your Home's Appeal to Potential Buyers
We pride ourselves in providing personalized solutions that bring our clients closer to their dream properties and enhance their long-term wealth. Contact us today to find out how we can be of assistance to you!